02-25-2019, 06:42 PM
Things were going okay until Gigi decided she had to have input - it started with a simple question - do we need more outlets? The immediate answer was 'yes'. There are only two to power 5 workstations. But then she had to go on about how to redesign the room after our graphic team measured it all out - it's a tetris problem squeezing five stations, shelves and file cabinets into the small space. It's going to be really tight and not well ventilated. They weren't done when I left just prior to 3 - wanted to get Stacy over the hill before the storm hit. I really hope they are done by tomorrow morning. A lot has to happen quickly for me. I must secure my promised real estate before Gigi re-orgs it on a whim. So stressful. With the warehouse a total mess and the possible rain, getting all the furniture and stuff over will be a task. I just want to get it over with, to regain some stability, ASAP, before I lose it and shank someone. Everyone looks so shankable now to me. That's really a bad sign. I'd disarm, but I'll need my skeletool for the move.
Shadow boxing the apocalypse

